Advertisement for Bids - Davisburg and Rose Pioneer Replacement Septic System

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS
HOLLY AREA SCHOOLS

DAVISBURG REPLACEMENT SEPTIC SYSTEM
ROSE PIONEER REPLACEMENT SEPTIC SYSTEM 

Holly Area School District will receive firm prime contractor bids for the Davisburg Replacement Septic System and Rose Pioneer Replacement Septic System projects located in Holly, Michigan.

The bidding documents consist of plans and specifications as prepared by Boss Engineering, 3121 E. Grand River Avenue, Howell, MI 48843. Documents may be downloaded from Pipeline Suite. Contact Steffan Demetropoulos or Shawn Debo at AUCH Construction, 248-334-2000, if you need assistance viewing or obtaining documents from Pipeline Suite. A copy of the documents will also be available for review at the offices of AUCH Construction, 65 University Drive, Pontiac, MI, 48342, on or after January 17, 2023.

A Pre-Bid meeting will be held at Davisburg Elementary School, located at 12003 Davisburg Rd, Springfield Township, MI 48350 on Tuesday, January 24, 2023 at 4:00 PM. The meeting will be held on-site at the front entrance.

An opaque envelope bearing your proposal must identify your company, the project being bid “HAS Davisburg & Rose Pioneer Replacement Septic Systems” and “Sealed Bid, Do Not Open”. The proposal shall be addressed to the attention of Mr. Scott Roper, Superintendent, Holly Area Schools, 920 Baird Street, Holly, MI 48442. 

Bids must be delivered no later than 12:00 noon on Tuesday, February 7, 2023 to Holly Area School District at the address noted above or AUCH Construction.  Each proposal must be submitted on the forms furnished by the Construction Manager and must be completed in full.  Familial Disclosure Statement and the Affidavit of Compliance to the Iran Economic Sanctions Act must both be completed and notarized.  A bid bond executed by a U.S. Treasury Listed Surety Company acceptable to AUCH Construction or a cashier’s check in the amount of at least 5% of the sum of the proposal payable to Holly Area Schools shall be submitted with each proposal in excess of $28,048.00. All proposals shall be firm for a period of sixty (60) days.

Bids will be publicly opened and read at a meeting convened at the Holly Area Schools Administration Building located at 920 Baird Street, Holly, MI 48442 starting at 1:30 PM on February 07, 2023.

Successful bidders whose proposals are $50,000 or more will be required to furnish a Satisfactory Performance and Payment Bond in the amount of 100% of their bid.  The cost of the Bond shall be included in each proposal.

The Board of Education reserves the right to reject any and/or all bids in whole or in part and to waive any informalities therein.  The Board of Education reserves the right to accept that bid which in its opinion, is in the best interest of the Owner.

Jennifer Young
Secretary Board of Education
Holly Area Schools

PDF DocumentAdvertisement for Bids - Davisburg and Rose Pioneer Replacement Septic Systems